The challenge commenced in April 2022 and concluded up at the begin of December, getting just one of our last big challenge completions of the yr.

We completed a full property refurbishment of the two storey flat, an further floor was established by extending into the loft with mansard roofing on each sides.  We labored in collaboration with Architect, Conrad Margoles (www.conradmargoles.com)

The total undertaking value was all over £200k-£300k

The consumer was exceptionally delighted with the close final result.

 

Function done:

  • Alternative kitchen
  • New flooring – picket, tiled and carpet
  • Loft extension.
  • New double glazed window.
  • New skylights
  • New electrics in the course of
  • New shopper unit
  • New boiler, cylinder, pump and drinking water tank
  • 3 new loos
  • 4 bedrooms
  • 3 reception rooms